In our NC Solutions database you will find solutions for frequently required tasks

Cycle 202 is not available on my TNC

NC FAQ1097

Question:

On my TNC the soft key for defining Cycle 202 BORING is blank. The User’s Manual says: Machine and control must be specially prepared by the machine tool builder for use of this cycle.

Answer:

A closed-loop spindle is necessary for Cycles 17, 18, 202, 204 and 217. If your machine has not been equipped for this, the TNC automatically hides the cycles and the soft keys are blank.

Product type

FAQ Machine control Programming TNC 640 TNC 426/430 iTNC 530 TNC 128 TNC 620 TNC 320
Back to overview