Wählen Sie ein anderes Land oder eine andere Region, um Inhalte für ihren Standort zu sehen

In our NC Solutions database you will find solutions for frequently required tasks

Set datum at the highest determined Z coordinate

NC8210

NC program for measuring the Z coordinate at several points and writing the coordinates of the highest point to a marker. The control then moves to the X/Y position of the highest point and sets the Z datum there. In a table, you define the positions at which the control is to measure the Z coordinate.

Product type

TNC 640 TNC 620 TNC 320 Milling in 3 axes (X, Y, Z) Milling in 3 + 2 axes (X, Y, Z + inclined axes) Milling in 5 axes (X, Y, Z + tilting axes) Machine control Measuring / probing Tables Calculations TNC7 NC program
Back to overview